Thang, T.D. and Duong, L.V. and Dat, C.V. and Phong, C.X. and Hai, B.V. and Don, L.Q. (2024) Dynamics of Heavy Mechanized Bridge During Span-Lowering Process. Advances in Military Technology, 19 (1). pp. 165-175. ISSN 18022308
Full text not available from this repository. (Upload)Abstract
Heavy mechanized bridge is utilized to be rapidly deployed as a temporary bridge to facilitate the movement of vehicles and personnel across obstacles. This paper presents a dynamic model of the TMM-3M heavy mechanized bridge during the span-lowering process, including considerations of cable deformation, rear outriggers, elasticity of tire, and front suspension system. Based on the dynamic model, the authors establish a system of differential equations describing the oscillation of the system using Lagrangian equations of the second kind. The article provides a fundamental basis for studying the entire process of deploying the TMM-3M bridge and aims to improve the rear outriggers and cable winding system to reduce bridge deployment time. © 2024, University of Defence. All rights reserved.
Item Type: | Article |
---|---|
Divisions: | Offices > Office of International Cooperation |
Identification Number: | 10.3849/aimt.01878 |
URI: | http://eprints.lqdtu.edu.vn/id/eprint/11328 |