LE QUY DON
Technical University
VietnameseClear Cookie - decide language by browser settings

Dynamics of Heavy Mechanized Bridge During Span-Lowering Process

Thang, T.D. and Duong, L.V. and Dat, C.V. and Phong, C.X. and Hai, B.V. and Don, L.Q. (2024) Dynamics of Heavy Mechanized Bridge During Span-Lowering Process. Advances in Military Technology, 19 (1). pp. 165-175. ISSN 18022308

Full text not available from this repository. (Upload)

Abstract

Heavy mechanized bridge is utilized to be rapidly deployed as a temporary bridge to facilitate the movement of vehicles and personnel across obstacles. This paper presents a dynamic model of the TMM-3M heavy mechanized bridge during the span-lowering process, including considerations of cable deformation, rear outriggers, elasticity of tire, and front suspension system. Based on the dynamic model, the authors establish a system of differential equations describing the oscillation of the system using Lagrangian equations of the second kind. The article provides a fundamental basis for studying the entire process of deploying the TMM-3M bridge and aims to improve the rear outriggers and cable winding system to reduce bridge deployment time. © 2024, University of Defence. All rights reserved.

Item Type: Article
Divisions: Offices > Office of International Cooperation
Identification Number: 10.3849/aimt.01878
URI: http://eprints.lqdtu.edu.vn/id/eprint/11328

Actions (login required)

View Item
View Item